Effective immediately, the posted load limit for Booth Bridge has been reduced from 20 tons to 10 tons. A review of the structure was conducted by Kresin Engineering, and this recommendation was received by the Township on August 31st, 2021.
The load restriction will remain in place until Council receives a detailed evaluation that confirms the safe load capacity of this bridge.
Our apologies for any inconvenience this may cause; the safety and well-being of all users of this bridge remains our first priority.